Oakdene Estate, Ocean Grove
Residential Subdivision Client: Private Developer
Residential Subdivision Client: Private Developer
Client: Australian Automotive Research Centre Construction of a 70,000m2 asphalt skid pan including 800m2 of tiled testing surface. As part of the works a 50ML dam was built with poly liner and pump house.
Client: Ford Motor Company of Australia 180,000m3 of Earthworks required to construct a 65,000m2 asphalt skid panto be utilised in the testing of vehicles. Comprehensive pipe work and concrete also installed.
Client: Queenscliff Harbour Pty Ltd Construction of a 400 berth marina including 15,000m3 of dry excavation and over 20,000m2 of various pavements.
Client: Abi Group (for Barwon Water) Our role in this project was to install 26 km of 700mm GRP pipe though private property and within the road reserve from Lovely Banks Basin to Little River. A number of air and scour valves were constructed along the alignment.
Client: Barwon Water This project involved the installation of 20 km of 600mm diameter MSCL pipe from Anglesea Basin to Wurdee Boluc, as part of the Anglesea Borefiled project. The pipe consisted of rubber ring and welded joints and was constructed through private property and road reserves.
Industrial Subdivision Client: City of Greater Geelong First stage of councils’ GREP (Geelong Ring Road Employment Precinct) site in Corio included signalised intersection works in Bacchus Marsh Road and 1km of road works and services including, sewer, water, drainage, power, Telstra and gas.
Subdivision Client: Deakin University Extension of existing road network involving 3,600m2 of pavement, 1200m of kerbing, 2,300m of services and re-sheeting one of the main entrances into the campus.