Limeburner’s Carpark East Geelong

Client: COGG Construction of permeable and asphalt pavement surfaces to deliver an additional 66 double car parking bays, enhancing capacity and accessibility at the facility. The project also includes associated drainage and landscaping works, along with the construction of an access ramp for non-powered watercraft, improving usability for the wider community.

Ford Proving Ground, Lara

Client: Ford Motor Company of Australia 180,000m3 of Earthworks required to construct a 65,000m2 asphalt skid panto be utilised in the testing of vehicles. Comprehensive pipe work and concrete also installed.

Melbourne Geelong Pipeline

Client: Abi Group (for Barwon Water) Our role in this project was to install 26 km of 700mm GRP pipe though private property and within the road reserve from Lovely Banks Basin to Little River. A number of air and scour valves were constructed along the alignment.

Anglesea Transfer Main

Client: Barwon Water This project involved the installation of 20 km of 600mm diameter MSCL pipe from Anglesea Basin to Wurdee Boluc, as part of the Anglesea Borefiled project. The pipe consisted of rubber ring and welded joints and was constructed through private property and road reserves.