Client:

Barwon Water

This project involved the construction of Stage 1 of the Southern Ovoid Sewer Replacement. Reinforced plastilined concrete, 1500, 1650 and 1950 mm nominal diameter sewer pipes were constructed at varying depths.
The location of the works extended from near the centre of the Geelong Racecourse to Leather Street, Breakwater. There was also a section of the pipeline from private property extending across the Barwon Heads Road to Reserve Road Marshall. A section of the works included 1800mm Pipe Jacking 140m long. A major component of the works involved by-pass pumping of sewerage flows as high as 1000L/sec.