Southern Ovoid Sewer

Client: Barwon Water This project involved the construction of Stage 1 of the Southern Ovoid Sewer Replacement. Reinforced plastilined concrete, 1500, 1650 and 1950 mm nominal diameter sewer pipes were constructed at varying depths. The location of the works extended from near the centre of the Geelong Racecourse to Leather Street, Breakwater. There was also…

Leopold Rising Main

Client: Barwon Water Alliance This Contract was for the construction of the Leopold Sewer Rising Main No. 1, which Comprised of approximately 7.7 kilometres of 700mm GRP pipe from Leopold to Geelong Racecourse. A number of difficult bores were required as part of the works along with the connection of the new main into an…