Anglesea Proving Ground, Anglesea
Client: Australian Automotive Research Centre Construction of a 70,000m2 asphalt skid pan including 800m2 of tiled testing surface. As part of the works a 50ML dam was built with poly liner and pump house.
Client: Australian Automotive Research Centre Construction of a 70,000m2 asphalt skid pan including 800m2 of tiled testing surface. As part of the works a 50ML dam was built with poly liner and pump house.
Client: Ford Motor Company of Australia 180,000m3 of Earthworks required to construct a 65,000m2 asphalt skid panto be utilised in the testing of vehicles. Comprehensive pipe work and concrete also installed.
Client: Queenscliff Harbour Pty Ltd Construction of a 400 berth marina including 15,000m3 of dry excavation and over 20,000m2 of various pavements.
2017-18 Young St, Thomson approximately 15kms 2017-18 Fischer Street, Belmont approximately 11kms 2018-19 Patrick Street, Whittington approximately 15kms
Client: Abi Group (for Barwon Water) Our role in this project was to install 26 km of 700mm GRP pipe though private property and within the road reserve from Lovely Banks Basin to Little River. A number of air and scour valves were constructed along the alignment.
Client: Barwon Water This project involved the installation of 20 km of 600mm diameter MSCL pipe from Anglesea Basin to Wurdee Boluc, as part of the Anglesea Borefiled project. The pipe consisted of rubber ring and welded joints and was constructed through private property and road reserves.
Client: Barwon Water This project involved the construction of Stage 1 of the Southern Ovoid Sewer Replacement. Reinforced plastilined concrete, 1500, 1650 and 1950 mm nominal diameter sewer pipes were constructed at varying depths. The location of the works extended from near the centre of the Geelong Racecourse to Leather Street, Breakwater. There was also…
Client: Barwon Water Alliance This Contract was for the construction of the Leopold Sewer Rising Main No. 1, which Comprised of approximately 7.7 kilometres of 700mm GRP pipe from Leopold to Geelong Racecourse. A number of difficult bores were required as part of the works along with the connection of the new main into an…
Industrial Subdivision Client: City of Greater Geelong First stage of councils’ GREP (Geelong Ring Road Employment Precinct) site in Corio included signalised intersection works in Bacchus Marsh Road and 1km of road works and services including, sewer, water, drainage, power, Telstra and gas.