Client:

Barwon Water Alliance

This Contract was for the construction of the Leopold Sewer Rising Main No. 1, which Comprised of approximately 7.7 kilometres of 700mm GRP pipe from Leopold to Geelong Racecourse. A number of difficult bores were required as part of the works along with the connection of the new main into an existing pit.